At 2:14 a.m., a cold-storage controller reboots twice, a conveyor motor growls, and the lights dim but do not go out. That is often brownout electricity: the grid is still energiz...
READ MOREProduct Features
Four valves per cylinder; the fuel system can be optionally equipped with either an electronically governed mechanical pump or an electronic unit pump, effectively improving combustion and emissions while ensuring smooth operation and good fuel economy.
A gantry-type engine block with evenly distributed reinforcements provides high rigidity, compact structure, low vibration, and low noise.
Split camshaft design ensures precise control of valve timing and fuel injection; optimized cam profile reduces impact forces, enhancing reliability and durability.
Equipped with an electric pre-lubrication pump to automatically supply oil before startup.
Technical Parameters
|
Unit power |
800 KW |
Engine |
Shanghai Diesel Engine 6WTAA35-G31 |
||||
|
Generator |
Yangzhou Kangcheng KC800-4 |
|
|
||||
|
Engine: 6WTAA35-G31 |
Generator: single bearing, IP22 protection rating, Class H insulation |
||||||
|
Radiator rated for 40°C ambient temperature, cooling fan with safety guard, air filter, fuel filter, and oil filter |
|||||||
|
Common steel base frame, vibration isolators, standard control panel |
|||||||
|
24V charging alternator, industrial-grade silencer (muffler), and standard connection fittings |
|||||||
|
Maintenance-free lead-acid battery and battery connecting cables |
|||||||
|
Voltage level |
|||||||
|
Voltage V |
Frequency Hz |
Number of phases |
Rated current A |
Power KW |
Power factor |
||
|
400/230 |
50 |
3 |
1440 |
800 |
0.8 |
||
|
Engine parameters |
|||||||
|
Manufacturer/Model |
Shanghai Diesel Engine Co., Ltd. / 6WTAA35-G31 |
||||||
|
Intake system |
Supercharged Intercooler |
||||||
|
Cylinder liner type |
wet |
||||||
|
Number of cylinders/arrangement |
6-cylinder/inline |
||||||
|
Displacement |
35.1 L |
||||||
|
Cylinder bore * stroke |
186*215 mm |
||||||
|
Compression ratio |
16:1 |
||||||
|
Rated speed |
1500rpm |
||||||
|
Engine power (main/spare) |
882KW/970KW |
||||||
|
Speed control system |
Electrically controlled unit pump |
||||||
|
Fuel system |
|||||||
|
Fuel consumption rate |
195 g/kw.h |
||||||
|
Lubrication system |
|||||||
|
Lubricating oil capacity |
75~100 L |
||||||
|
Cooling system |
|||||||
|
Coolant capacity |
78 L |
||||||
|
Generator parameters |
|||||||
|
Number of phases |
3 |
||||||
|
Wiring method |
Three-phase four-wire, Y-type interconnection |
||||||
|
Number of bearings |
1 |
||||||
|
Power factor |
0.8 |
||||||
|
Protection level |
IP22 |
||||||
|
Altitude requirements |
≤1000m |
||||||
|
Excitation system |
Brushless self-excited magnet |
||||||
|
Insulation class/temperature rise class |
H/H |
||||||
|
Telephone Influence Factor (TIF) |
<50 |
||||||
|
Telephone harmonic coefficient THF |
<2% |
||||||
|
Unit performance parameters |
|||||||
|
Voltage setting range |
≥±5% |
||||||
|
Steady-state voltage regulation |
≤±1% |
||||||
|
Transient voltage deviation (100% sudden power reduction) |
≤+25% |
||||||
|
Transient voltage deviation (sudden power increase) |
≤-20% |
||||||
|
Voltage recovery time (100% sudden power reduction) |
≤6S |
||||||
|
Voltage recovery time (sudden power increase) |
≤6S |
||||||
|
Frequency setting range |
0-5% |
||||||
|
Steady-state frequency band |
≤1.5% |
||||||
|
Transient frequency deviation (100% sudden power reduction) |
≤+12% |
||||||
|
Transient frequency deviation (sudden power increase) |
≤-10% |
||||||
|
Frequency recovery time (100% power drop) |
≤5S |
||||||
|
Frequency recovery time (sudden power increase) |
≤5S |
||||||
|
Unit weight |
|
||||||
|
Unit size |
|||||||












At 2:14 a.m., a cold-storage controller reboots twice, a conveyor motor growls, and the lights dim but do not go out. That is often brownout electricity: the grid is still energiz...
READ MOREImagine a storm has knocked out power, the portable generator is running in the driveway, and someone has a heavy cord with two male ends. The plan is simple: plug one end into th...
READ MOREWhen a utility feeder trips at 02:40, a cold-storage warehouse has roughly 20 minutes before product loss begins; a server room has less than one. That gap — between the moment th...
READ MOREPicture a food-processing plant specifying a 400 kW standby set: the load list is finished, the switchgear is chosen, and the only open question is which engine platform sits on t...
READ MOREThe engine is rarely why a Weichai diesel generator fails its site acceptance test. In most of the failure reports we review, the cause is one of three specification errors: the l...
READ MOREEngineering Support Beyond the Generator