A regional hospital in Central Asia needed a 500 kW standby set that could run up to 2,000 hours a year across six sites. The procurement team shortlisted three brands, but the Cu...
READ MOREUltra-low fuel consumption: Optimized engine intake and fuel systems fully exploit engine potential, with a focus on reducing fuel consumption in the 60%–90% load range.
Cold climate adaptability: The engine can start directly at -15°C without any auxiliary measures; at -30°C, the engine can start smoothly using intake preheating.
High-altitude adaptability: The engine can deliver rated power at altitudes below 2000 m and operate reliably at altitudes above 2000 m.
Excellent compatibility: Equipped with a centrally mounted downward-facing turbocharger and a specially designed flat-bottom oil pan, the overall engine height is reduced. The compact structure makes it an ideal power solution for various generator set applications.
Technical Parameters
|
Unit power |
140KW |
Engine |
Weichai Power WP6D167E200 |
||||
|
Generator |
Yangzhou Kangcheng KC140-4 |
|
|
||||
|
Engine: WP6D167E200 |
Generator: Single bearing, IP22 protection rating, H-class insulation. |
||||||
|
Water tank is 40℃, cooling fan with fan safety cover, air filter, fuel filter, and oil filter. |
|||||||
|
Shared steel chassis, shock absorbers, and standard control panel. |
|||||||
|
24V rechargeable generator, industrial muffler and standard connecting parts. |
|||||||
|
Maintenance-free lead-acid battery and battery connection cables. |
|||||||
|
Voltage level |
|||||||
|
Voltage V |
Frequency Hz |
Number of Phases |
Rated Current A |
Power KW |
Power Factor |
||
|
400/230 |
50 |
3 |
252 |
140 |
0.8 |
||
|
Engine parameters |
|||||||
|
Manufacturer/Model |
Weichai Power WP6D167E200 |
||||||
|
Intake System |
Turbocharging + intercooling (turbocharged intercooled) |
||||||
|
Fuel System |
High-pressure common rail |
||||||
|
Number of Cylinders/Arrangement |
6-cylinder/inline |
||||||
|
Displacement |
6.87L |
||||||
|
Bore * Stroke |
105*130 mm |
||||||
|
Compression Ratio |
17:1 |
||||||
|
Rated Speed |
1500rpm |
||||||
|
Engine Power (Common/Spare) |
152KW/167KW |
||||||
|
Speed Control System |
Electronic speed control |
||||||
|
Fuel system |
|||||||
|
Backup fuel consumption rate |
195g/kw.h |
||||||
|
Lubrication system |
|||||||
|
Lubricating oil capacity |
18 L |
||||||
|
Cooling system |
|||||||
|
Coolant capacity |
36L |
||||||
|
Generator parameters |
|||||||
|
Number of phases |
3 |
||||||
|
Wiring method |
Three-phase four-wire, Y-type interconnection |
||||||
|
Number of bearings |
1 |
||||||
|
Power factor |
0.8 |
||||||
|
Protection class |
IP22 |
||||||
|
Altitude requirement |
≤1000m |
||||||
|
Excitation system |
Brushless self-excited magnet |
||||||
|
Insulation class/Temperature rise class |
H/H |
||||||
|
Telephone impact factor (TIF) |
<50 |
||||||
|
Telephone harmonic factor (THF) |
<2% |
||||||
|
Unit performance parameters |
|||||||
|
Voltage Setting Range |
≥±5% |
||||||
|
Steady-State Voltage Regulation |
≤±1% |
||||||
|
Transient Voltage Deviation (100% Power Drop) |
≤+25% |
||||||
|
Transient Voltage Deviation (Power Increase) |
≤-20% |
||||||
|
Voltage Recovery Time (100% Power Drop) |
≤6S |
||||||
|
Voltage Recovery Time (Power Increase) |
≤6S |
||||||
|
Frequency Setting Range |
0-5% |
||||||
|
Steady-State Frequency Band |
≤1.5% |
||||||
|
Transient Frequency Deviation (100% Power Drop) |
≤+12% |
||||||
|
Transient Frequency Deviation (Power Increase) |
≤-10% |
||||||
|
Frequency Recovery Time (100% Power Drop) |
≤5S |
||||||
|
Frequency Recovery Time (Power Increase) |
≤5S |
||||||
|
Unit Weight |
|
||||||
|
Unit Dimensions |
|||||||












A regional hospital in Central Asia needed a 500 kW standby set that could run up to 2,000 hours a year across six sites. The procurement team shortlisted three brands, but the Cu...
READ MOREA tender arrives with a hard number: 1,200 kW of standby power for a mineral processing plant, a 90-day delivery window, and a budget that rules out most imported engine packages....
READ MOREWhen a procurement manager sees “260kW backup set” on a project list, the first question is usually whether a 325kVA unit can handle everything that starts at once. The answer is ...
READ MOREImagine a cold-storage warehouse on a July afternoon. The grid fails at 2:10 p.m. and does not return for 40 minutes. With no electric generator connected, the temperature climbs...
READ MOREA packaging plant in eastern China lost grid power for eighteen minutes one afternoon. The line stopped, and the day's shipment slipped. For most operations, an industrial power s...
READ MOREEngineering Support Beyond the Generator